Migration is a scheduling problem before it is a technical one.

The hard part of moving to the cloud is rarely the technology. It is sequencing the move so the business keeps running — and that is exactly what we plan around from day one.

Our position

Not everything should move.

Lift-and-shift of a workload that was never designed for elastic infrastructure often produces a more expensive version of the same problem. Some systems are cheaper and safer where they are, at least until they are due for replacement anyway.

The assessment sorts your estate into four buckets — move as-is, move with changes, replace, and leave alone — with the reasoning written down for each. You will usually find at least one system in the last bucket that somebody assumed was going.

A migration plan that cannot tell you what it is not moving has not been thought through yet.

Engineers planning a cloud migration at a whiteboard
Platform coverage

Where we work, and how deeply.

Deep, production-tested coverage across all three major clouds. This shows where we lead the work directly and where we bring specialist depth alongside our own engineers.

Cloud platform coverage by workload type
Workload Microsoft Azure Amazon Web Services Google Cloud
Virtual machines & networking Primary Primary Supported
Identity & access management Primary Supported Supported
Managed databases Primary Primary Supported
Object & file storage Primary Primary Supported
Backup & disaster recovery Primary Primary Supported
Containers & orchestration Supported Primary Supported
Data warehousing & analytics Supported Supported Primary

Primary means we have delivered production migrations on it and lead the work end to end. Supported means we deliver it to the same standard, drawing on partner specialists where a workload calls for niche depth.

What we provide

The work, in detail.

Expand whichever is relevant. Most engagements use three or four of these, not all seven.

A full inventory of what is running, what depends on what, and what each system costs you today. Produces the four-bucket sort, a sequencing plan ordered by dependency and risk, and a cost projection with its assumptions stated. This is the deliverable you keep whether or not we do the migration.

Migration method

Six stages, in this order, for a reason.

The order matters more than the speed. Skipping the pilot to save three weeks is how eighteen-month migrations happen.

01

Inventory

What is running, what talks to what, and what nobody has logged into for two years.

02

Sort & sequence

The four buckets, ordered by dependency. Low-risk systems first to prove the pipeline.

03

Landing zone

Networking, identity, policy, and monitoring built before any workload arrives.

04

Pilot migration

One real but non-critical system, migrated end to end, including a rehearsed rollback.

05

Waves

The rest in grouped waves, each with its own window, abort point, and verification.

06

Decommission

Old infrastructure retired only after the new one has run a full billing and backup cycle.

Start with the inventory.

Before committing to any platform, get a written picture of what you have and what it costs. That assessment stands on its own — and it is yours to keep.